FESTO电磁阀,SMC电磁阀,SMC定位器,SMC气管,SMC比例阀,ABB电机,HYDAC电磁阀,DAIKIN油泵,YUKEN比例阀,schrack继电器,ATOS电磁阀,SMC气缸,FESTO气缸,BURKERT电磁阀,ASCO电磁阀

产品资料
首页 >>> 产品目录 >>> 日本SMC电磁阀/气缸 >>> SMC传感器
泵阀网 >>> 展馆展区 >>> 其他 >>> 其他 >>> 日本SMC气动位置传感器
产品[

日本SMC气动位置传感器[产品打印页面]

]资料
如果您对该产品感兴趣的话,可以 产品名称: 日本SMC气动位置传感器
产品型号: -
产品展商: SMC
关注指数:469
产品文档: 无相关文档

简单介绍

日本SMC气动位置传感器 3。在2个位置安装支架联合(ISA-3-A)。 注)进行的螺丝临时收紧。 4。确认现有交换机的SUP口的凹槽 已密封的连接增设车站。

日本SMC气动位置传感器  的详细介绍
日本SMC气动位置传感器
1. Mount the seal conduit on the terminal box. For mounting
procedure, refer to the catalog and instruction manual provided
by the manufacturer of the seal conduit.
2. Thread the cable through the seal conduit and arrange wiring
according to the polarity of the terminal block illustrated above.
3. Fasten the seal conduit with a tightening torque not greater
than 5 N􀀀m. Do not hold the terminal box or the switch.
The detection distance is set with the LED level meter and setting
Keep the setting dial pulled out while in use. If released, it will
return to its original position and become unable to rotate.
1. For accuracy in setting, apply a clearance gauge to the detection
nozzle to replicate the set condition in advance.
2. Confirm that the set pressure is applied. If the setting dial is
fully open, the LED level meter appears as .
3. Pull the setting dial and rotate it in the positive direction. The
Throttle setting for blowing to prevent water and cutting oil from
(Clockwise: Close throttle; Counterclockwise: Open throttle)
∗ The setting is not applicable to valves without throttle.
2. Rotate the throttle clockwise for adjustment so that the
detection nozzle will not suck up water or cutting oil.
3. Power on the valve, then off again.
Confirm that the detection nozzle does not suck up water
Note) Do not rotate the throttle more than 5 turns or it will fall
4. The sensor output comes on when the lights on the LED level
meter turn on as . Complete the setting when this condition
5. Apply the clearance gauge again to confirm that the lights turn
2. Setting the installation needle
The installation needle should be moved by the fingertip.
Set the 2 green installation needles at the maximum and
minimum limits of pressure.
After setting the installation needles, locate the OPEN
arrow at the top right position and insert the claws on the
cover into the grooves on the case (indicated by in the
expanded view of A part). Rotate the cover clockwise until
it stops. Confirm that the cover is firmly secured.

产品留言
标题
联系人
联系电话
内容
验证码
点击换一张
注:1.可以使用快捷键Alt+S或Ctrl+Enter发送信息!
2.如有必要,请您留下您的详细联系方式!
  • 温馨提示:为规避购买风险,建议您在购买前务必确认供应商资质与产品质量。
  • 免责申明:以上内容为注册会员自行发布,若信息的真实性、合法性存在争议,平台将会监督协助处理,欢迎举报


产品搜索

联系我们
产品目录
Copyright@ 2003-2024  上海乾拓贸易有限公司版权所有        
 

沪公网安备 31011402005013号

点击这里给我发消息 点击这里给我发消息 点击这里给我发消息 点击这里给我发消息 点击这里给我发消息 点击这里给我发消息 点击这里给我发消息