如果您对该产品感兴趣的话,可以
产品名称:
VP542-5GD1-03A_进口SMC气控阀
产品型号:
VP542-5GD1-03A
产品展商:
SMC
关注指数:441
产品文档:
无相关文档
简单介绍
VP542-5GD1-03A_进口SMC气控阀
exhaust conductance should be confirmed referring to the figure onx Opening of the initial exhaust valve (valve S)
VP542-5GD1-03A_进口SMC气控阀
的详细介绍
VP542-5GD1-03A_进口SMC气控阀
<Operating principle> Series XMD, XYD
zInitial exhaust valve opening adjustment
The initial exhaust rate should be adjusted before operation (with pilot
port S in an unpressurized state).
The initial exhaust rate is set to zero by turning the adjustment nut
clockwise until it just stops. (Do not use a tool.)
The initial exhaust rate is adjusted by turning the nut anti-clockwise.
The number of adjustment nut (its pitch is 1 mm) rotations and initial
When pressure is applied to the pilot port S, the valve S is removed
from the valve S assembly and opens until the adjusted opening
c Opening of the main exhaust valve (valve M)
When pressure is applied to the pilot port M, the valve M is removed
from the body seat surface and fully opens.
v Closing of the initial exhaust valve, the main exhaust valve
By removing the pressure from the pilot ports S and M, both valves
return to their sealed position.
采用精密铸造一体化结构,无气体滞留。
与铝制高真空L型阀XL系列的安装有互换性 (XM系列)
(加压通/弹簧密封) 氮气、空气、惰性气体等 VCR®
特长 阀与针阀一体化结构使配管缩短为原来的1/4。
(阀芯)座部分采用间隙隔膜,微粒子数量大幅降低。
伴随主供气初期供气可进行流量调整。
specification H0). Standard lead wire length is 0.5 m. Add 揕?to the end of
the part number when 3 m is desired, 揗?when 1 m, and 揨?when 5 m.
?Part numbers indicating changed seal material and leakage 1)
Note 1) Values at ambient temperatures, excluding gas permeation.
Note 2) Refer to parts number of 揅onstruction?on the page 87 for changed part.
Number indicates parts number of 揅onstruction?accordingly.
To order something else 揘il?(standard), list the symbols starting with
- 温馨提示:为规避购买风险,建议您在购买前务必确认供应商资质与产品质量。
- 免责申明:以上内容为注册会员自行发布,若信息的真实性、合法性存在争议,平台将会监督协助处理,欢迎举报